British BulletinBritish Bulletin
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Tech & Science
  • Travel
  • Spotlight
  • More
    • Press Release
What's On

WSL Highlights: Aston Villa 0-2 West Ham United

4 May 2026

'Anything to get out of the UK!' Keir Starmer accused of 'absenteeism' as PM cosies up to the EU on latest trip

4 May 2026

CHELSEA 1-3 NOTTINGHAM FOREST – Calum McFarlane reaction

4 May 2026

How to look younger: Stylist shares haircut that can ‘take years off instantly’

4 May 2026

World Snooker Championship 2026: Wu Yize holds off Shaun Murphy fightback to retain slender lead in final

4 May 2026
Facebook X (Twitter) Instagram
Web Stories
Facebook X (Twitter) Instagram
British Bulletin
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Tech & Science
  • Travel
  • Spotlight
  • More
    • Press Release
British BulletinBritish Bulletin
Home » Beetle infestation puts Wigan church on at-risk register | Manchester News
News

Beetle infestation puts Wigan church on at-risk register | Manchester News

By britishbulletin.com10 November 20252 Mins Read
Beetle infestation puts Wigan church on at-risk register | Manchester News
Share
Facebook Twitter LinkedIn Pinterest Email

Michelle AdamsonNorth West

Historic England Interior of church with massive white drape covering a walled section and metal scaffolds around the sides. Pews and vaulted wooden arches in front of stained glass windows. Historic England

Investigations are exploring the scale of the damage in the church

An infestation of deathwatch beetles has led to an Elizabethan church being put on Historic England’s at-risk register.

St Wilfrid’s Church, in Wigan, Greater Manchester, is among 138 sites added to the list this year after the insects damaged its decorative timber ceilings.

Services are continuing at the Grade I-listed church in Standish despite the erection of scaffolding to investigate the scale of the problem, its rector Reverend Andrew Holliday said.

He told Radio Manchester that beetle larvae “burrow into the wood and just chomp away at it, creating lots of dust in the process”.

“What it does is effectively eat it away. In the chancel area, what we’ve discovered is actually some catastrophic damage that the beetle has done over a number of years.

“Some of the enormous timbers are actually hollow.”

Historic England Cut marks through wooden section of ceiling showing where beetles have chomped through three circles decorated with floral motifs.Historic England

Beetle larvae have been “chomping” on the wooden ceiling, the vicar said

Historic England Aerial drone view of church with spire above scaffolding surrounding the main base of the building. Autumnal trees and a graveyard are outside the church with houses and countryside around.Historic England

St Wilfrid’s Church dates from the 1580s and a church has been on site since the 13th Century

The addition of the church to the register will “bring people’s attention to the buildings that need it most”, Florence Salberter, from Historic England, said.

She compared it to a “health check”, adding: “It really shows that we need to focus on these buildings, on churches, that have been there for communities for centuries.”

Rev Holliday said current investigations exploring the scale of the problem will “give us a broad scope of what we’re really dealing with”.

He continued: “And then we’ll begin the whole process of planning next steps and next stages – which is not only the work itself and what’s involved – but also some major grant funding that we will be seeking to help us look after this incredible building.”

Rev Holliday, who wears glasses and brown jumper over his clerical collar, smiles as he stands in front of scaffold with a large stained glass window behind.

Rev Holliday said the church was still conducting services as usual

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Two people arrested following arson arrack on memorial wall in Golders Green

Father-son duo break THREE world records after cycling 18,000 miles around the globe for charity

Leicestershire news: Investigation launched after 30,000 tonnes of rubbish dumped at protected site

Radek Vitek: Legendary Czech keeper Petr Cech has advice for Man Utd youngster | Manchester News

Temperatures to fall this week after the bank holiday | UK News

Morris dancing tradition celebrated across UK this May Bank Holiday

Cambridge University fails to suspend students who threatrened to kill classmate over Israel trip

Fuel stations face enormous fines under new laws designed to protect petrol and diesel drivers

New cancer jab not yet available in Northern Ireland | UK News

Editors Picks

'Anything to get out of the UK!' Keir Starmer accused of 'absenteeism' as PM cosies up to the EU on latest trip

4 May 2026

CHELSEA 1-3 NOTTINGHAM FOREST – Calum McFarlane reaction

4 May 2026

How to look younger: Stylist shares haircut that can ‘take years off instantly’

4 May 2026

World Snooker Championship 2026: Wu Yize holds off Shaun Murphy fightback to retain slender lead in final

4 May 2026

Subscribe to News

Get the latest Brittan News and Updates directly to your inbox.

Latest News

Two people arrested following arson arrack on memorial wall in Golders Green

4 May 2026

Ex-Tory MP Mark Field backs Nigel Farage’s call for Royal Navy intervention as 900 more people cross into Britain

4 May 2026

Princess Beatrice’s husband sends message to his sister-in-law

4 May 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 British Bulletin. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.